Quote Originally Posted by JT View Post
Wow... I sure hope the estimates on my latest graphical one are wrong.

0/25 frames completed
16210 m/frame
11d:05h:56m:40s to next frame end
281d:10h:11m:37s to WU end


Wow. I mean, the 9+ months isn't so bad, except for that nagging 37 seconds at the end. That's a deal breaker!


I've never seen a job with that long an estimate. (It's IBX in water, if anyone cares.)

(It's got a deadline of April 16. so if the estimates don't get better by tomorrow, I may have to abort it.)
Estimates are always loopy for the first couple frames with that client. I really should say "not available".

But could check the log file (IIRC fahlog.txt) to see if there are any error messages.
Also, if there were unexpected reboots (system crashes, power failures, etc.) the client could switch to a "safe" mode. That makes it significantly slower! (depends on the project but I've seen it taking twice as long in safe mode). To override safe mode, add -forceasm in the shortcut. Otherwise I'm not sure, but think that once a project is completely successfully it will return back to regular mode...?